CFA Power Continuity Project – Stage 2
Integrilink in conjunction with Upsonic Power were selected to complete a rollout of 6kva UPS units for CFA to maintain power to critical equipment in case of interruptions to supply.

CFA selected certain sites across the state that were recognized as requiring redundant power supply to maintain the ability of their personnel to continue to operate during an incident should there be any interruptions of supply to the sites.

Upon consultation with the Project Managers and operational personnel onsite, Integrilink were able to complete the installation and commissioning of the 6kva UPS units at each site in a suitable location to allow maintenance to be carried out on the units without intefering with the normal business operations at each CFA site.